~17B galDirect water consumed by all U.S. data centers in 2023
2–4×Projected growth in direct consumption by 2028
~211B galIndirect water used in 2023 to generate their electricity — about 12× direct use
U.S. data center water use, 2023 — billions of gallons

Government Lawrence Berkeley National Laboratory, 2024

Source updates: irregularly — major reports in 2016 and 2024, update in 2025 · We check for new editions monthly

Supporters point to ≤8.4M gal/yr Projected water use for Microsoft’s mostly closed-loop Mount Pleasant, Wisconsin campus at full build. Government City of Racine records, via WPR, Sep 2025
Skeptics point to 2.8M gal/day Average water consumed per day in 2024 by Google’s Council Bluffs, Iowa data center — about 1 billion gallons for the year. Industry Google 2025 Environmental Report
How the amounts compare
Water useAs publishedPer dayKind of useSource
Single homes, sites and cities
One person at home, U.S. average82 gal/day82 galUsedGovernmentUSGS, 2015 data
Average family at home300+ gal/day300+ galUsedGovernmentEPA WaterSense
One acre of irrigated U.S. farmland (average)1.5 acre-feet/yr≈1,300 galApplied to cropsGovernmentUSDA NASS irrigation survey, 2023
Microsoft Mount Pleasant, Wis., data center campus (projected, full build)≤8.4M gal/yr≤23,000 galUsedGovernmentCity of Racine records, via WPR
18-hole golf course (median)79.1 acre-feet/yr≈70,600 galApplied to turfIndustryGCSAA water survey, 2020 data, Table 32
Google Council Bluffs, Iowa data center (2024)2.8M gal/day2.8M galConsumedIndustryGoogle 2025 Environmental Report
Des Moines, Iowa city water system (serves 600,000 people)20.05B gal/yr≈55M galProduced (withdrawn)GovernmentDes Moines Water Works, 2023
National totals
All U.S. data centers, on site (2023)~17B gal/yr≈47M galConsumedGovernmentLBNL 2024 report
Power plants making U.S. data centers’ electricity (2023)~211B gal/yr≈578M galConsumedGovernmentLBNL 2024 report
All U.S. golf courses (2020)1.69M acre-feet/yr≈1.5B galApplied to turfIndustryGCSAA water survey, 2020 data, Table 1
All U.S. thermoelectric power plants (2015) — two USGS estimates4.31B gal/day · 2.7B gal/day2.7–4.31B galConsumedGovernmentUSGS Fact Sheet 2018-3035, 2015 data · USGS SIR 2019-5103, 2015 data
All U.S. crop irrigation (2015)73.2B gal/day73.2B galConsumedGovernmentUSGS Fact Sheet 2018-3035, 2015 data

Reading the table: “Used” and “produced” count water taken in, including water later returned to rivers or sewers. “Consumed” counts water that evaporates or is otherwise not returned. “Applied” is water put on land; the golf and farm surveys do not split it further. Data center rows are shaded. Per-day figures marked ≈ are our conversions of the published numbers (1 acre-foot = 325,851 gallons; 365 days a year); all others are as published. Golf figures are medians from a survey of 1,575 facilities. Per unit of electricity, U.S. data centers consumed about 0.36 liters per kilowatt-hour on site in 2023, and about 4.52 liters per kilowatt-hour at the power plants supplying them (LBNL 2024 report, pp. 48, 58).

Still uncertain: most companies do not report water use site by site, and national totals rely on estimates. Closed-loop designs save water but use somewhat more electricity.

Government National figures: Lawrence Berkeley National Laboratory, 2024 U.S. Data Center Energy Usage Report.

Opinion · Paired with an opposing view

Opinion: opposing views on water

Loading…

Published pieces, linked to the originals. We don’t endorse either view. All opinion pairs

← All issues · Documents on this issue in the Library